From the Wilmington Journal |
|
December 22, 1862 |
|
Chief Eng. & Sup't Office W. & W.
R. R. {Wilmington & Weldon RR} |
|
Until further notice a Mail
and Passenger Train will run to Neuse River Bridge, daily, on and
after Monday next. Leave Wilmington, 8 A. M. Arrive at Neuse River
Bridge, 1:20 P. M. Connect with train to Weldon at 6 A. M., next day.
Leave Neuse River, 2 P. M. Arrive at Wilmington, 8 P. M. A Mail and
Passenger Train will leave Goldsboro', at 6 A. M., daily, and connect
with Mail Train through to Richmond same day. Returning to Weldon
daily at 12 M. and reach Goldsboro' at 5:30 P. M. connecting with
Wilmington Train by Ferry, at Neuse River next day. |
S. L. Fremont |
Eng. & Sep't |
|