Blue Mountain & Rome R. R.
   Wanted, for the Alabama Division of the Blue Mountain & Rome R. R. (37 miles,) 90,000 Cross Ties -- delivered along the line of road, about 2,400 per mile. The ties must be 8 1/2 feet long -- seven inches thick, and have a face of at least 8 inches -- sawed or cut square at the ends, well hawed on both sides, barked, and piled convenient to the Road bed, at the rate of 15 ties for 100 feet.
   Post and White Oak timber preferred; the varieties of oak, and pine, when chiefly heart, will also be received.
   The ties will be let in large or small lots, and payments made on certificate of delivery.
   Proposals will be received for 20 days.
   Address this office, or apply to assistant Engineers upon the Line.
Geo. Wadsworth
Chief Engineer