NA, M&T 6/30A/1863

Engineer Dept. CS Army
Grenada Mi 30 June 1863
 
Maj E A Banks Chf Qr Mr
Dept Mi & E La
 
Sir,
   The following is the estimated amount of work done by the Miss & Tenn RR Co. under Contract with the Confederate States for Reconstructing Bridges and said Railroad
$10855 & $3200::  Reconstruction of Bridges from Grenada to Long Creek inclusive, including smithy work on Iron bolts for Talllahatchie Bridge at Crystal Springs $14055.00
Deduct former payments 10200.00
     Amount due $3855.00
   I Certify the above to be correct, and the Post Qr Mr CSA at Grenada will pay the above amount as required by the terms of said Contract
Minor Meriwether
Engr Corps Army Miss & Engr in Chg of Construction