Engineer Dept. CS Army
|
Grenada Mi 30 June 1863 |
|
Maj E A Banks Chf Qr Mr |
Dept Mi & E La
|
|
Sir, |
The following is the estimated
amount of work done by the Miss & Tenn RR Co. under Contract with
the Confederate States for Reconstructing Bridges and said Railroad |
$10855 & $3200:: |
Reconstruction of Bridges from Grenada to Long
Creek inclusive, including smithy work on Iron bolts for
Talllahatchie Bridge at Crystal Springs |
$14055.00 |
|
Deduct former payments |
10200.00 |
|
Amount due |
$3855.00 |
|
I Certify the above to be
correct, and the Post Qr Mr CSA at Grenada will pay the above amount
as required by the terms of said Contract |
Minor Meriwether |
Engr Corps Army Miss & Engr in Chg of
Construction |
|