NA, ENG 4/2/1864

Engineer Bureau
April 2d 1864
 
   Endorsement on letter from Geo. G. Hull Supt. Atlanta & West Point RR Enclosing his bar iron required to build bridge over Chattahoochee River -- March 16/64.
   Engr Bureau. April 2d 1864. Respy forwarded to the Nitre & Mining Bureau. Mr. Hull Supt. Atlanta & W. P. RR. telegraphs that the length of the spans of the bridge are 140 ft each and that a lattice bridge will not answer.
A. L. Rives
Lt Col &c &c

Home