NA, ENG 3/16/1864

Engineer Bureau
March 16, 1864
 
Col. D. B. Harris, Chf Engr &c
Charleston S. C.
 
   The reports of various practical Rail road men seem to indicate that, in the Spring street connection, the construction of an easier curve is far preferred to a turn table and that it cost would not exceed ten thousand dollars. If so please have the curve constructed and charge to the Quarter Master Department. This is authorized by Lt. Col. F. W. Sims Superintendent of Rail Road transportation.
A. L. Rives
Lt Col &c &c
 
Approved
F. W. Sims
Lt. Col. & Q. M.

Home