June 24
{1863} |
|
Engineer Bureau |
Richmond |
|
Report against the substitution of the Port Walthall for the City Point
Branch. 500 or 600 tons of rail required by South Side RR to repair the
main line. Great importance of the South Side road. Suggests iron that
might be spared for that purpose, with reasons therefor. |
Capt. G. E. Walker
and C. F. M. Garnett,
Commissioners |
{Summary entry in Letters Received Register} |
|