Fernandina, March 20th 1861 |
|
John Bradford Esqr |
Insptg. Engr. |
|
Dear Sir, |
In accordance with your wish
I will state that the length of the Florida Rail Road from the End of
the track at Fernandina, to the End of the track at Cedar Keys is one
hundred and fifty four miles and sixteen hundred and four feet (154
miles 1604 feet) according to Location Measurement. The track is laid
to the End of the Wharf at Cedar Keys. |
? Oscar Koevner |
Resident Engr Fla R. R. |
|
Memorandum: The track was finished to the
end of the Wharf at Cedar Keys on the 19th {might
be 14th} day of March, 1861. |
? Oscar Koevner |
|