FA, F 3/25/1861

{The below document lists milestones in the completion of the Florida RR. I is written in the hand of David Yulee, its President. The exact date of its writing is unknown, but the last date included was the completion of the road on March 25, 1861. I suspect this was a draft for a report to the Board of Internal Improvements relating to the bonds the RR had received from them.}
   The track was laid to the Warf March 16, 1861 (but it was not completed of surfacing &c)
   The length of line is 154 58/100 miles -- & there was 2 75/100 miles siding & Y track on 3 may 1860. Since then siding at No 4, at Way Key, & several one side tracks at Ferna (among these one via Ladds wharf to Center St at junction of Font St)  have been made.
   On 13 decr 1859 Mr E. L. Herriot Engr reported to the ??? Int. Impt Fund that "the graduation has been continuously made & the xties delivered along the line of the road a distance of 35 47/100 miles, in the direction of Cedar Keys, being from the 117 1/2 mile to the 152 97/100 mile point, where the line leaves the main land near Cedar Keys." "All the bridging has been completed between these points, with the exception of 200 ft of trestle work across Otter Creek, the material for which is upon the ground" The superstructure both wood & iron has been continuously laid from the (108) to the 127 57/100 mile from Fernandina, a distance of 19 57/100 miles." but he adds the rail is laid over the section without chairs 
   On May 19, 1860, Mr. L W Dubois Engr reported that "the remainder of the Fla. RR from the 152.97/100 mile point to the end of the road, a distance of 1 61/100 mile," was constructed & "ready for the iron rail." "The side lines measure 10.764 30/100 feet. The Y tracks measure 3049 feet, the entire length of both 13813 3/10 ft. or 2 61/100 miles." Reports also "that from the 108 mile point for 37 25/100 miles, the iron is laid continuously with chairs the entire distance, forming a track as solid & smooth as any in Florida."
   On 3rd May 1860 Capt M L Smith made a statement under oath which was attached to Mr Duboi's report & he makes the length of road 154 58/100 miles, and length of siding & Y track 2 3/4 miles
   On 25 March 1861 Mr John Bradford, Engr, reported that the track was completed from the 145 1/4 mile point from Fernandina, to Cedar Key, being 9.054 miles. He also reported that according to the information he obtained, the track to the wharf at C Key was completed "on or about March 16, 1861."
Note Florida seceded on Jany 1861
  The battle of Fort Sumter begun April 12, 1861
Ascertain what has been done for RR's in the several Southern States.
   Virga. In 1859. The state had aided the Railroads by cash, subscriptions, loans, & guarantees &c to the amt of R17,213,860.89. Of which $14,779.324.74 was in subscriptions paid in for capital stock agst $9,130,445.84 paid in up to same time by others than the State. (note much of this last was stock paid out to contractors). At this time there were 1438 miles in operation, out 287 miles of it was part of the Balt & Ohio RR in which the state took no part, the actual amt of miles therefore of state road improvements for which this aid was contributed was 1157 miles (or $15000 pr mile).

Home